Sod Calculator
Estimate lawn area, sod rolls, material cost, and installation time with an adjustable waste allowance.
About sod quantity and project estimates
Sod calculation examples
| Lawn dimensions | Roll and waste | Order result |
|---|---|---|
| 50 × 20 ft | 10 ft², 10 percent waste | 110 rolls for 1,100 ft² |
| 30 × 20 ft | 10 ft², no waste | 60 rolls for 600 ft² |
| 40 × 25 ft | 8 ft², 8 percent waste | 135 rolls for 1,080 ft² |
How to estimate sod
- Measure the lawn length and width in feet, dividing irregular areas into rectangles when needed.
- Enter the square-foot coverage and price of one supplier roll.
- Choose a waste allowance and enter a realistic installation rate.
- Calculate the order, then confirm product coverage, site measurements, and delivery details with the supplier.
Sod calculator FAQ
How much extra sod should I order?
A 5 to 10 percent waste allowance often suits simple layouts. Complex curves, obstacles, diagonal cuts, or uncertain measurements may require a larger allowance.
Why does the calculator round up rolls?
A fraction of a roll normally cannot complete an order or cover the remaining space. Rounding up ensures the estimated order covers the waste-adjusted area.
How do I measure an irregular lawn?
Split it into rectangles and calculate each area separately, then add the results. Subtract patios, beds, and other spaces that will not be covered.
Does estimated cost include installation?
No, it includes only the entered per-roll sod price. Delivery, pallets, preparation, equipment, labor, tax, and other project charges must be budgeted separately.
How soon should sod be installed?
Sod should generally be installed promptly after delivery because rolled turf can heat and deteriorate. Follow the grower or supplier's timing, storage, and watering instructions for local conditions.